Delhi–Mumbai Expressway: Open Stretches, Toll and Driving Tips

Which parts of the Delhi–Mumbai Expressway are open as of November 2026, how the distance-based toll works, the remaining gaps and practical tips for long drives.

By Published 6 min read

As of November 2026, the Delhi–Mumbai Expressway is drivable for most of its length but is not yet complete end to end. You can drive from the Delhi-NCR end through Haryana and Rajasthan into Madhya Pradesh up to Thandla near the Gujarat border. In Gujarat, the Limkheda–Godhra section opened in October 2026 and stretches further south are operational, but a short section between Limkheda and the MP border was still being finished, with officials targeting December 2026 or January 2027.

Toll is charged by the distance you travel between entry and exit, and because this is an NHAI road, the FASTag annual pass is valid. Here is what is open, how much it roughly costs and how to drive it safely. Check the NHAI Rajmargyatra app before every trip, because sections open on trial and change often.

Status by section (November 2026)

  • Delhi end: the DND–Faridabad–Sohna link connects Delhi to the main expressway. Around 50 km had opened in phases, and a 9 km DND–Jaitpur elevated stretch opened for trial runs in August 2026.
  • Sohna to Dausa and Lalsot: open since 2023, the first stretch to carry traffic.
  • Jaipur link: the 67 km Bandikui–Jaipur spur connects Jaipur to the expressway.
  • Rajasthan to Madhya Pradesh: continuous driving from Delhi up to Thandla in MP was reported in October 2026. Work on a tunnel in the Mukundra Hills area near Kota was still in progress, so follow diversion boards in that area.
  • Gujarat: Limkheda–Godhra (about 55 km) opened in October 2026, and stretches from Kharel near Navsari up to Limkheda are operational. The Limkheda–MP border section remained under construction.
  • Maharashtra: the Maharashtra state government targeted opening its part, linking towards JNPA port, in 2026. Check the latest status before planning a drive to Mumbai on it.

Because the status changes month to month, treat this list as a snapshot and confirm on Rajmargyatra or recent news before a long drive.

How toll works on the expressway

The expressway is a closed system with interchanges. Your FASTag is read when you enter and when you exit, and the toll is calculated on the distance in between. You will not see a plaza every 60 km as on older highways.

  • Example: Delhi to Jaipur via Sohna and the Bandikui link costs a car roughly Rs 650 to Rs 700 one way as of 2026.
  • Longer runs: Delhi to Kota or beyond costs proportionally more.
  • Under-construction sections: the government approved cuts of up to 50 percent on certain incomplete stretches during 2026, so some sections may cost less until they are fully finished.

As of 2026, check the NHAI Rajmargyatra app for the exact current rate between your entry and exit. For the Jaipur route in detail, see our Delhi to Jaipur toll guide.

FASTag rules that matter here

  1. Your tag must read at both entry and exit. If entry is not recorded, the exit plaza may charge the maximum fare for that direction. Keep the tag stuck firmly on the windscreen.
  2. Keep enough balance. Long trips can mean a single large deduction at exit. Check before you start using our guide on how to check FASTag balance.
  3. Annual pass: for private cars, one entry-exit counts as one trip. Our FASTag annual pass guide explains the limits.
  4. Without a valid FASTag: on national highways, cash costs double and UPI costs 1.25 times the toll.

Speed limits and enforcement

The expressway is designed for high speeds, and limits are higher than on regular highways on many stretches. However, limits vary by section, and lower limits apply near interchanges, under-construction zones and the Delhi urban stretch. Follow the boards, not your car's capability.

Cameras and patrol vehicles record overspeeding, lane violations and illegal stopping. Challans are sent to your registered mobile number. After a long trip, check pending challans using our guide on e-challan check by vehicle number.

Who cannot use the expressway

  • Two-wheelers and three-wheelers
  • Tractors and non-motorised vehicles
  • Pedestrians and animals

These users must take parallel national highways.

Driving tips for long stretches

  • Fuel before entry. Wayside amenities are still being built on several sections. Do not enter with less than half a tank.
  • Tyres: check pressure cold before starting. High speed on hot concrete is hard on worn or under-inflated tyres.
  • Fatigue: the road is straight and monotonous. Stop every two hours, even for five minutes.
  • Night driving: stray animals have been reported crossing on some stretches. Use high beam only when no vehicle is ahead.
  • Breakdowns: stop fully on the shoulder, switch on hazards, place a triangle 50 metres behind and call 1033.
  • Documents: carry RC, insurance, PUC and licence. See our car road trip checklist for a full list.

Wayside amenities and emergency help

Wayside amenities, with fuel, food, toilets and parking, are being added along the expressway, but several stretches still have long gaps between them. On newly opened sections in Gujarat, reports in October 2026 noted that fuel pumps and restaurants were not yet available. Plan with this in mind:

  • Carry drinking water, some snacks and a basic first-aid kit.
  • Note the national highway helpline 1033 for breakdowns, accidents and emergencies.
  • Save a family member's number as an emergency contact in your phone and keep it visible in the car for anyone helping after an accident.
  • Charge your phone fully; network coverage can be weak in some remote stretches.

Common mistakes on the new expressway

  • Following an old map that routes you onto a trial or closed section.
  • Running out of fuel between interchanges.
  • Stopping on the shoulder for photos or snacks.
  • Not noticing a wrong exit charge because SMS alerts were ignored.

Manage tolls and documents with ParkPing

A single Delhi–Mumbai Expressway trip can mean one large deduction you will want to verify. The ParkPing app lets you link the FASTag you already have from any bank, check the live balance, recharge from your phone and see every toll deduction with plaza details. Set it up on the FASTag recharge and balance check page.

Before a long road trip, also make sure your insurance is valid. ParkPing's insurance expiry reminder alerts you about 30 days before your policy expires, and stores your RC and PUC with their own reminders.

In short

The Delhi–Mumbai Expressway is already a fast way to reach Jaipur, Kota and much of the route into Gujarat, but it is not finished end to end as of November 2026. Check the latest open sections, keep your FASTag funded, plan fuel stops, and follow posted limits.

#Delhi Mumbai Expressway#expressway status#toll charges#FASTag#road trip#NHAI
ParkPing Team Writes about vehicle ownership in India for ParkPing — the windshield QR card that lets anyone reach you without showing your number.

Frequently asked questions

Is the Delhi–Mumbai Expressway fully open?
Not yet, as of November 2026. Delhi to Thandla near the MP–Gujarat border is drivable, parts of Gujarat including Limkheda–Godhra are open, but a section between Limkheda and the MP border was still under work, and stretches towards Mumbai were being finished.
How is toll charged on the Delhi–Mumbai Expressway?
It is a closed, access-controlled expressway. Your FASTag is read at entry and exit, and you pay for the distance travelled. Rates are revised every year.
What is the toll from Delhi to Jaipur via the expressway?
For a car using the Bandikui–Jaipur link, roughly Rs 650 to Rs 700 one way as of 2026, including the Sohna connector. Check the Rajmargyatra app for current rates.
Can I use the FASTag annual pass on this expressway?
Yes. For private cars, jeeps and vans, one entry-exit on the expressway counts as one trip under the annual pass.
Are two-wheelers allowed on the expressway?
No. Two-wheelers, three-wheelers and slow vehicles are not permitted on this access-controlled expressway.

Stop finding out too late.

Blocked cars, lights left on, new challans — ParkPing tells you the moment it matters.